Casing Design for 13000' test gas well in Dripping ...

Object Details

View

Title Information:simple
Casing Design for 13000' test gas well in Dripping Rock field near Wamsutter, WY

Name:Personal
James Benson
Role :Text(marcrelator)
creator

Name:Personal
Kristin Carter
Role :Text(marcrelator)
creator

Name:Personal
Patrick Gardner
Role :Text(marcrelator)
creator

Name:Personal
Aaron Bounds
Role :Text(marcrelator)
creator

Name:Personal
Brandon Heiner
Role :Text(marcrelator)
creator

typeOfResource
text
genre
Powerpoint/PDF
Origin Information Place
Laramie, Wyoming

University of Wyoming
(keyDate="yes")
4/24/2010

Language:Text

Physical Description

born digital

abstract
Background: Casing a wellbore is an integral part of drilling and completing oil and gas wells. In this project, a 13,000 foot test gas well in the Dripping Rock field near Wamsutter, Wyoming was used as a model for the design project. Economic and safety concerns are two major considerations for this design. Method: Using similar nearby wells and principles of drilling and completion engineering, a recommendation for casing this well was created. Results: A complete casing program was created after considering three different preliminary designs. The most viable is a two-string design using 7 casing from surface to 10,500 feet and finishing with 5 casing in the target formation. Conclusion: Based on similar well casing programs in the area and the criteria learned for drilling and completion engineering, it is felt that the design created is adequate while remaining economic.
note
From - Undergraduate Research Day 2010 - Celebration of Research - Abstracts
Subject
Undergraduate Research Day

Related Item:series Title Information
Undergraduate Research Day 2010

Location (usage="primary display")
http://hdl.handle.net/10176/wyu:603

accessCondition:useAndReproduction
http://digital.uwyo.edu/copyright.htm
Record Information languageOfCataloging :Text(ISO639-2B)
English
:Code(ISO639-2B)
eng